5 gates gradedFloodThe whole tract is Zone X
FEMA national flood layer, read 2026-11-22.
Wetlands6.58 ac mapped, 1.63 of it pond
FWS National Wetlands Inventory. Mapped, not delineated, so a delineation on the ground can move these lines.
Sewer, by gravityThe fall works, the crossing does not
A gravity line reaches MH12 with 25.0 ft to spare, so the ground is not the problem. The route crosses a corridor that is its own parcel and the owner has refused a crossing, so what stands in the way is permission rather than elevation. That is a different question and it is asked of a different body.
Lots on septicNot computed
No septic rule is stored for this county, so no lot ceiling was computed. The minimum usable area per lot differs between counties by several times, and borrowing another county's figure would read like an answer.
The rules themselves6 of 9 questions answered
This jurisdiction answers 6 of 9 required questions. Unanswered: septic, overlays, moratoria. A question with no answer is not the same as a question with the answer no.
What the seller said, and what the record says back
3 of 6 decided from the record
75 acresThe record says otherwise72.92 ac measured on the county polygon
Split 25 / 50 acres by a railroad lineThe record says otherwisethe railway splits it 47.05 ac and 25.87 ac
Sewer is not availableNot establishedthe facts for this run do not carry an answer
It does not floodConfirmedthe whole tract is Zone X, minimal flood hazard
Public water available directly to the siteSeller statementno measurement is wired to this sentence yet
Several subdivisions starting construction in this areaSeller statementno measurement is wired to this sentence yet
The rest stay the seller's words until something checks them.
A claim nobody has checked is not a claim that failed.
Parcel
The parcelRailway
Boundary from the Harnett County parcel record, read 2026-11-22. The map beneath it is OpenStreetMap.
The tract is recorded in 2 pieces with a railway corridor between them. The corridor is not part of the parcel, so crossing it is the railway's to allow. The two pieces measure 47.05 ac and 25.87 ac.
The railway is owned by Raleigh and Fayetteville Railroad LLC, and the line is active.
BAIN JEFFREY S also owns 1 other parcel next to this one, 74.02 ac in all. Is any of it part of what you are buying?
The ground falls 92.4 ft across the tract, measured at 46 points.
Latest update
2026-11-22 · version 2
Raleigh and Fayetteville Railroad LLC answered: A bored utility crossing under the embankment at this location is not permitted. The corridor is a separate parcel and no crossing right is recorded.